Blueprint Ballpark
Building onGround floor

Lot & site

Set the lot size and how high to raise it above the road. Fill, retaining walls, fencing and parking paving are priced in Site Works.

Common lots

Lot area 0

Price list

Unit prices drive every number in the estimate. Defaults are ballpark Philippine prices; replace them with your supplier quotes. Edited prices are highlighted and saved in this browser.

Controls

RotateDrag empty space, Option + drag, two-finger swipe sideways, Q E, or right-drag
PanShift + drag, Space + drag, W A S D, or middle-drag
ZoomScroll or pinch
Camera padBottom-right buttons: pan, rotate, tilt, zoom, reset
WalkWalk button, then W S walk, A D sidestep, ← → turn, Shift run, drag to look
DriveDrive button, then W gas, S brake/reverse, A D steer, Space brake
Walk / drive viewV first or third person, F get in or out of the car, Esc back to building
Change floor[ ] or the arrows at the top
Rotate furnitureR
Remove selectionDel
Undo / redoCtrl Z / Ctrl Shift Z
CancelEsc

How the estimate works

Each wall, slab, column and roof is broken down into materials using standard estimating factors: 12.5 hollow blocks per m² of wall, Class A concrete at 9 bags of cement per m³, rebar by kg per m³, and so on. Ground-floor walls and columns get footings automatically, and suspended slabs get a beam allowance. Labor is a percentage of construction materials. Doors, windows, furniture and allowances are priced as supply & install (S&I). Contingency, overhead & profit and VAT go on top.

Treat the result as a ballpark for early budgeting, not a contractor's bid.

New project

Tell us about the lot. The estimate starts at ₱0 and only counts what you build, plus fill if you still have to raise the lot.

Shape

Site

Fence, parking and land price are in Lot & site whenever you need them.

My estimates

Estimates saved to your account. Open one from any device after signing in.

Project file